SPEC: MEP-HYD-2026 // PE #54921 // 701 N 3RD ST, MINNEAPOLIS, MN 55401
AUDITS DESK: [email protected]
GREENABILITY MEP & DECARBONIZATION ENGINEERING
DATA GOVERNANCE PROTOCOL ZERO THIRD-PARTY TRACKING OCTOBER 2026 EDITION

Engineering Telemetry & Client Data Privacy Protocol

Formal privacy and technical confidentiality standards governing client mechanical schedules, building automation telemetry, utility interval billing data, and proprietary facility process blueprints.

CONFIDENTIALITY DIRECTIVE // REF: GOV-2026-PRIV

Protection of Critical Commercial & Industrial Infrastructure Data

COMPLIANCE OFFICE
GREENABILITY FLUID SYSTEMS LLC
MINNEAPOLIS, MN

At GreenAbility Decarbonization & Fluid Systems LLC ("GreenAbility", "we", "our", or "the firm"), we recognize that commercial HVAC mechanical schedules, building automation system (BAS) network topologies, electric demand interval data, and industrial piping blueprints represent sensitive, proprietary commercial assets.

This Data Governance and Privacy Protocol outlines our stringent procedures regarding the collection, analysis, storage, and protection of engineering data gathered during ASHRAE Level I, II, and III energy audits, hydronic pump testing, and Section 179D tax certifications.

1. Scope and Categories of Technical Data Collected

In the course of providing mechanical engineering consulting services, we collect and process several categories of information:

2. Engineering Use of Facility Telemetry

All technical data and utility records entrusted to GreenAbility are utilized exclusively for the specific mechanical engineering scopes authorized by the client:

3. Strict Non-Disclosure & Information Security Safeguards

GreenAbility treats all client engineering records as strictly confidential under legally binding Non-Disclosure Agreements (NDAs). We enforce comprehensive technical safeguards:

4. Zero Third-Party Advertising Trackers

In accordance with our anti-surveillance engineering ethics, the website yourgreenability.com operates with zero third-party tracking scripts:

5. Document Retention & Data Deletion

Client energy simulation models, tax allocation certificates, and signed PE engineering calculations are retained for a statutory period of seven (7) years following project commissioning to comply with IRS substantiation guidelines for Section 179D tax deductions and Minnesota Board of Architecture, Engineering, Land Surveying, Landscape Architecture, Geoscience and Interior Design (AELSLAGID) professional record-keeping mandates. Upon conclusion of statutory retention requirements, digital files are purged using DoD 5220.22-M compliant electronic sanitization methods.

6. Inquiries and Compliance Contact

For inquiries regarding our technical data governance protocols, or to request execution of a mutual Non-Disclosure Agreement prior to transmitting facility blueprints, please contact:

Data Governance & Confidentiality Desk
Dr. Aris Thorne, PE, CEM
GreenAbility Decarbonization & Fluid Systems LLC
701 N 3rd St, North Loop, Minneapolis, MN 55401
Email: [email protected]